In Progress
K-Electric
Sergi protection of Auto Transformer System
In Progress
LUCKY CORE INDUSTRIES LIMITED
Glucose Transfer Pipeline (Jacketed)
In Progress
Orient Energy System FZCO
Erection of 2 x 25MW HFO Fired Powerhouse (karbala & Najaf - Iraq)
In Progress
Pakistan Security Printing Corporation (Pvt.) Ltd
Fire Suppression System Works
Fire Suppression System Works (1,500 GPM)
Supply, Fabrication & Installation of Fire Suppression System Works in Factory Area.
Pump Room Work – Installation of Fire Pump Diesel Engine Driven, Electrical Motor Driven & Electric Motor Driven Jockey Pump, Accessories, complete with Controller, Suction & Discharge Pipings, Sensing Lines, Valves & Assemblies, Hooter & Light, Ventilation System, Fire Sprinklers System etc
Firewater Ringmain – HDPE SDR-11 underground Piping accross building outskirt & aboveground ULFM metallic Piping on engineering supports conforming NFPA standards with branches for Fire Hydrants, Firehose Reels, Firebrigade Connections etc
HDPE Pipe (DN 250, DN200, DN 125) – 1,272 M
Metallaic Pipe (DN 250, DN 200) – 750 M
Firewater Network – Metallaic Piping in Factory Area + 4 Story Building, including Risers, Branch Connections, Installation of Fire hose Reels Cabinets, Hydrant Pillars
Metallaic Pipe (DN 150~DN32) – 1,750 M
Fire Hose Reel Cabinet – 62 Nos
Fire Brigade Connection – 02 Nos
External Fire Hydrants Wet Barrel Type- 08 Nos
External Landing Valve – Oblique Type with Quick Coupling – 05 Nos
30 kg CO2 Trolley – 02 Nos
50 Ltr AFFF Foam Trolley – 08 Nos
Seismic & Engineering Supports – 01 Lot
Civil Work – Pump Foundations, Dyke wall for Diesel Storage Tank, Excavation, Back Fill, Thrust Block, Underground Valve Chambers, Core Cuts & Doyma Sleevs etc.
Excavation – 2,300 M3
Thrust Block – 01 Lot
Electrical Work – Pumps Power & Intrument Cables, Hooter & Light, Emergency Stops, MCC & Control Panels, Termination & Commissioning.
English Biscuit Manufacturers
- Emergency Exist Stair at IT Building.
-
Water Transfer Pipeline Work.
- Supply & Fixing of Firefighting Revamping Work.
Supply, Fabrication & Installation of Fire Fighting Pipeline, Completing main Ring accros the buildings periphery with existing header, connecting to New Building & Existing buidling floors (3rd & 4th).
Installation of Fire Hose Reels Cabinet and connection with Main Circuit.
Quantum of Work;
DN 150 Pipeline – 600 RFT
DN 100 Pipeline – 600 RFT
DN 80 Pipeline – 250 RFT
DN 65 Pipeline – 180 RFT
DN 50 Pipeline – 150 RFT
DN 32 Pipeline – 120 RFT
DN 25 Pipeline – 60 RFT
Fire Hose Reel Cabinet – 10 Nos
Procter & Gamble Pakistan (P&G)
Powder Handling Buggies
Supply of Powder Handling Buggy with accessories & attachment as per the recommended design & specs.
- Quantity – 20 Nos
- Capacity – 03 Tons / Each
- Size (LxWxH) – 1,450 mm x 950 mm x 2,380 mm
Feroze 1888 Mills
Cargo Lift - Steel Structure Work
Fabrication & Erection of Steel Structure for Cargo Lift, Base Plate, Columns, Beams, Diagonal Supports, Machine Room Floor, Roof & Side
- Coverings
Capacity – 06 Tons - Cabin Size (WxL) – 4,650 mm x 6,950 mm
- Height (H)- 35,000 mm
K-Electric
OUTAGE 2023
- Repair / Replacement of Worn Parts of DN 1,200 Main Cooling Water Circuit Pipeline for Condenser
- Dismantling, Cleaning, Painting & Re-Installation of MCW Lines for Circuit # 1
- Dia. – 1,200mm, Run – 220 RFT, Spools – 10 Nos, Cathotic Protection Points – 26 Nos, Valves / Fittings – 10 Nos
- Painting DFT 250 μm
- Dismantling, Cleaning, Painting & Re-Installation of CCW Lines.
- Dia. – 500mm, Run – 160 RFT, Spools – 18 Nos, Cathotic Protection Points – 32 Nos, Valves / Fittings – 18 Nos
- Painting DFT 250 μm
National Foods
Suppy of Diesel Storage Tanks (API-650), Steel Supporting Structure on Roof Top, Placement of Tanks & Associate Piping for Filling & Delivery Lines to Gensets
Tank 1 – Old Power House
Capacity – 6,000 Ltrs
Configuration – Horizontal
Type – Cylinderical with Dish Ends
Footing – Saddles
Configuration – Ø 1,650 mm x L 3,650 mm
Tank 2 – New Power House
Capacity – 5,000 Ltrs
Configuration – Vertical
Type – Cylinderical with Dish Ends
Footing – Legs
Configuration – Ø 1,575 mm x L 3,350 mm
HQ Project Directorate NLC Sindh
Storm Water Drain
Design, Development & Supply of Steel Moulds, Slab Covers & Shuttering Plates for Concrete Pre-Cast
U Channels Section,
D 1 1 x 0.5 M
D 2 1 x 1 M
D 3 1 x 1.5 M
D 4 1.5 x 1 M
D 5 1.5 x 0.75 M
D 6 1.5 x 1.5 M
Shuttering Plates for U-Moulds
Plate 500 x 1,500 mm
Plate 750 x 1,000 mm
Plate 250 x 1,000 mm
Slab Covers
1,000 x 3,600 x 300 mm
2,450 x 1,000 x 225 mm
1,900 x 2,000 x 200 mm
1,400 x 2,000 x 200 mm
Project Duration – 12 Weeks
Parts Developement – 21,650
The moulds are in continous operation for casting sections for drain lines totalling ~21,750 M in run. Operation cycle for assembly & disassembly for charging concrete & discharging section take place every day.
Haris & Co
Installation of Fire Suppression System in Multi-story Buildings
Lucky One Mall – Residential Tower (A & B) 28 Floor
Fire Suppression System Piping, Risers, Downcomers, Landing Valves, Firehose Cabinet & Sprinklers systen in Lobbey Area
Signature – Residential Tower 27 Floor
Fire Suppression System Piping, Risers, Downcomers, Landing Valves, Firehose Cabinet & Sprinklers systen in Lobbey Area
Complete Pump Room with Installation of Diesel Engine Driven Fire Pump, Electric Motor Driven Fire Pump, Jockey Pump, Suction & Delivery Headers with Connecting Spools, Pressure Relief line with Valve & Mains for Risers
Installation of Engine Driven Pump Accessories, Diesel Tanks & Exhaust Muffler
Sukkur Beverages
Installation Of Diesel Genset Cummins C2250D5
Supply of 5,000 Liters Diesel Storage Tank, Sheet Thickness 5 mm with measuring Tube
Supply and installation of 38mm diameter fuel piping, MS Sch 40, Supply and Return line from 5000Ltr Fuel tanks to engine including water separator and bypass arrangement to day tank in all respect.
Supply & Installation of Exhaust piping (20ft both line) from engine exhaust flexible to exhaust silencer inlet & exhaust silencer outlet outside the power house including counter flange, bends, C-Chanel supports structure , clamp, roller support with bird mesh, with scaffolding arrangement and silencer drain (1”) 30ft arrangement with valve and breather piping 2” (10ft) arrangement outside the power house complete in all respect (20Ft)
Supply and Installation of Exhaust System thermal insulation & cladding (SS 304) complete in all respect with in powerhouse.
Supply and installation of GI ducting of radiator exhaust with canvas sheet arrangement and fixing with existing wall opening area complete in all respect.
Levelling of genset with grouting on existing foundation pad
Offloading & Placement of Genset on Foundation Pad
In Progress
K-Electric
Sergi protection of Auto Transformer System
In Progress
LUCKY CORE INDUSTRIES LIMITED
Glucose Transfer Pipeline (Jacketed)
In Progress
Orient Energy System FZCO
Erection of 2 x 25MW HFO Fired Powerhouse (karbala & Najaf - Iraq)
In Progress
Pakistan Security Printing Corporation (Pvt.) Ltd
Fire Suppression System Works
Fire Suppression System Works (1,500 GPM)
Supply, Fabrication & Installation of Fire Suppression System Works in Factory Area.
Pump Room Work – Installation of Fire Pump Diesel Engine Driven, Electrical Motor Driven & Electric Motor Driven Jockey Pump, Accessories, complete with Controller, Suction & Discharge Pipings, Sensing Lines, Valves & Assemblies, Hooter & Light, Ventilation System, Fire Sprinklers System etc
Firewater Ringmain – HDPE SDR-11 underground Piping accross building outskirt & aboveground ULFM metallic Piping on engineering supports conforming NFPA standards with branches for Fire Hydrants, Firehose Reels, Firebrigade Connections etc
HDPE Pipe (DN 250, DN200, DN 125) – 1,272 M
Metallaic Pipe (DN 250, DN 200) – 750 M
Firewater Network – Metallaic Piping in Factory Area + 4 Story Building, including Risers, Branch Connections, Installation of Fire hose Reels Cabinets, Hydrant Pillars
Metallaic Pipe (DN 150~DN32) – 1,750 M
Fire Hose Reel Cabinet – 62 Nos
Fire Brigade Connection – 02 Nos
External Fire Hydrants Wet Barrel Type- 08 Nos
External Landing Valve – Oblique Type with Quick Coupling – 05 Nos
30 kg CO2 Trolley – 02 Nos
50 Ltr AFFF Foam Trolley – 08 Nos
Seismic & Engineering Supports – 01 Lot
Civil Work – Pump Foundations, Dyke wall for Diesel Storage Tank, Excavation, Back Fill, Thrust Block, Underground Valve Chambers, Core Cuts & Doyma Sleevs etc.
Excavation – 2,300 M3
Thrust Block – 01 Lot
Electrical Work – Pumps Power & Intrument Cables, Hooter & Light, Emergency Stops, MCC & Control Panels, Termination & Commissioning.
2023-24
English Biscuit Manufacturers
- Emergency Exist Stair at IT Building.
-
Water Transfer Pipeline Work.
- Supply & Fixing of Firefighting Revamping Work.
Supply, Fabrication & Installation of Fire Fighting Pipeline, Completing main Ring accros the buildings periphery with existing header, connecting to New Building & Existing buidling floors (3rd & 4th).
Installation of Fire Hose Reels Cabinet and connection with Main Circuit.
Quantum of Work;
DN 150 Pipeline – 600 RFT
DN 100 Pipeline – 600 RFT
DN 80 Pipeline – 250 RFT
DN 65 Pipeline – 180 RFT
DN 50 Pipeline – 150 RFT
DN 32 Pipeline – 120 RFT
DN 25 Pipeline – 60 RFT
Fire Hose Reel Cabinet – 10 Nos
2023-2024
Procter & Gamble Pakistan (P&G)
Powder Handling Buggies
Supply of Powder Handling Buggy with accessories & attachment as per the recommended design & specs.
- Quantity – 20 Nos
- Capacity – 03 Tons / Each
- Size (LxWxH) – 1,450 mm x 950 mm x 2,380 mm
2022-2023
Feroze 1888 Mills
Cargo Lift - Steel Structure Work
Fabrication & Erection of Steel Structure for Cargo Lift, Base Plate, Columns, Beams, Diagonal Supports, Machine Room Floor, Roof & Side
- Coverings
Capacity – 06 Tons - Cabin Size (WxL) – 4,650 mm x 6,950 mm
- Height (H)- 35,000 mm
2022-2023
K-Electric
OUTAGE 2023
- Repair / Replacement of Worn Parts of DN 1,200 Main Cooling Water Circuit Pipeline for Condenser
- Dismantling, Cleaning, Painting & Re-Installation of MCW Lines for Circuit # 1
- Dia. – 1,200mm, Run – 220 RFT, Spools – 10 Nos, Cathotic Protection Points – 26 Nos, Valves / Fittings – 10 Nos
- Painting DFT 250 μm
- Dismantling, Cleaning, Painting & Re-Installation of CCW Lines.
- Dia. – 500mm, Run – 160 RFT, Spools – 18 Nos, Cathotic Protection Points – 32 Nos, Valves / Fittings – 18 Nos
- Painting DFT 250 μm
2023-24
National Foods
Suppy of Diesel Storage Tanks (API-650), Steel Supporting Structure on Roof Top, Placement of Tanks & Associate Piping for Filling & Delivery Lines to Gensets
Tank 1 – Old Power House
Capacity – 6,000 Ltrs
Configuration – Horizontal
Type – Cylinderical with Dish Ends
Footing – Saddles
Configuration – Ø 1,650 mm x L 3,650 mm
Tank 2 – New Power House
Capacity – 5,000 Ltrs
Configuration – Vertical
Type – Cylinderical with Dish Ends
Footing – Legs
Configuration – Ø 1,575 mm x L 3,350 mm
2023-2024
HQ Project Directorate NLC Sindh
Storm Water Drain
Design, Development & Supply of Steel Moulds, Slab Covers & Shuttering Plates for Concrete Pre-Cast
U Channels Section,
D 1 1 x 0.5 M
D 2 1 x 1 M
D 3 1 x 1.5 M
D 4 1.5 x 1 M
D 5 1.5 x 0.75 M
D 6 1.5 x 1.5 M
Shuttering Plates for U-Moulds
Plate 500 x 1,500 mm
Plate 750 x 1,000 mm
Plate 250 x 1,000 mm
Slab Covers
1,000 x 3,600 x 300 mm
2,450 x 1,000 x 225 mm
1,900 x 2,000 x 200 mm
1,400 x 2,000 x 200 mm
Project Duration – 12 Weeks
Parts Developement – 21,650
The moulds are in continous operation for casting sections for drain lines totalling ~21,750 M in run. Operation cycle for assembly & disassembly for charging concrete & discharging section take place every day.
In Progress
Haris & Co
Installation of Fire Suppression System in Multi-story Buildings
Lucky One Mall – Residential Tower (A & B) 28 Floor
Fire Suppression System Piping, Risers, Downcomers, Landing Valves, Firehose Cabinet & Sprinklers systen in Lobbey Area
Signature – Residential Tower 27 Floor
Fire Suppression System Piping, Risers, Downcomers, Landing Valves, Firehose Cabinet & Sprinklers systen in Lobbey Area
Complete Pump Room with Installation of Diesel Engine Driven Fire Pump, Electric Motor Driven Fire Pump, Jockey Pump, Suction & Delivery Headers with Connecting Spools, Pressure Relief line with Valve & Mains for Risers
Installation of Engine Driven Pump Accessories, Diesel Tanks & Exhaust Muffler
2021-2022
Sukkur Beverages
Installation Of Diesel Genset Cummins C2250D5
Supply of 5,000 Liters Diesel Storage Tank, Sheet Thickness 5 mm with measuring Tube
Supply and installation of 38mm diameter fuel piping, MS Sch 40, Supply and Return line from 5000Ltr Fuel tanks to engine including water separator and bypass arrangement to day tank in all respect.
Supply & Installation of Exhaust piping (20ft both line) from engine exhaust flexible to exhaust silencer inlet & exhaust silencer outlet outside the power house including counter flange, bends, C-Chanel supports structure , clamp, roller support with bird mesh, with scaffolding arrangement and silencer drain (1”) 30ft arrangement with valve and breather piping 2” (10ft) arrangement outside the power house complete in all respect (20Ft)
Supply and Installation of Exhaust System thermal insulation & cladding (SS 304) complete in all respect with in powerhouse.
Supply and installation of GI ducting of radiator exhaust with canvas sheet arrangement and fixing with existing wall opening area complete in all respect.
Levelling of genset with grouting on existing foundation pad
Offloading & Placement of Genset on Foundation Pad